# ERP Proposal Evaluation: How to Compare Licensing, Implementation, Data Migration and Support Like for Like

> ERP proposal evaluation: score licensing, implementation, data migration, integrations, compliance and support on one weighted matrix and pick the right bid.

Source: https://digitalbridge.com.tr/en/blog/how-to-evaluate-erp-proposals.html
Publisher: Digital Bridge Teknoloji (https://digitalbridge.com.tr)
Topic: Software Development
Published: 2026-10-09 · Updated: 2026-10-22

ERP proposal evaluation is the comparison of bids from [ERP (Enterprise Resource Planning)](https://digitalbridge.com.tr/en/glossary.html#erp) vendors not on the headline figure but on requirement fit, licensing model, implementation work, data migration, integrations, local regulatory compliance and post-go-live support, all on the same sheet. The reliable method has three parts: weighted scoring, a scripted demo using your own data, and reference calls.

## Key takeaways

- Compare ERP proposals on requirement fit, licensing, implementation, data migration, integrations, compliance and support, not on the headline total.
- Every ERP proposal should contain eight sections; a missing section is an ambiguity that can return after signature as an extra invoice.
- Set criterion weights (1–3) before opening the bids, score each proposal from 1 to 5 and add up weight multiplied by score.
- In Panorama Consulting's 2026 ERP Report, more than a quarter of respondents went over budget, most often because of an unexpected need for additional technology.
- Test the written proposal with a scripted demo using your own data and a reference call with a customer of similar size.

## Why do three ERP proposals never look alike?

A typical picture of mismatched ERP proposals looks like this: you asked three vendors to bid. One quotes an annual per-user subscription, another a perpetual licence plus implementation priced in consultant days, and the third sends a single "turnkey" figure. One never mentions data migration, one lists e-invoicing integration as "optional", and the third includes training for just two people. The proposal that looks cheapest on paper may simply be the one that covers the least work.

Proposals that cannot be compared usually have a root cause upstream, in how they were requested. If the vendors did not all receive the same written requirements in a [request for proposal (RFP)](https://digitalbridge.com.tr/en/glossary.html#rfp), each prices its own interpretation of the job and a fair comparison becomes impossible. If you have not yet settled what ERP should do for you or which module to start with, read our [guide to ERP for small businesses](https://digitalbridge.com.tr/en/blog/erp-for-smes.html) first; this article picks up once the bids are on the table.

## What does choosing the wrong ERP proposal cost?

A poor ERP selection comes back mid-project as extra budget and slipped deadlines, and international survey data suggests this is far from unusual:

> In [Panorama Consulting's The 2026 ERP Report](https://4439340.fs1.hubspotusercontent-na1.net/hubfs/4439340/Reports/ERP%20Report/2026-erp-report-panorama-consulting-group.pdf), more than a quarter of organisations said their project went over budget and almost a quarter said it ran over schedule. The most common reason for the budget overrun was an unexpected need for additional technology.

Panorama's budget-overrun finding points straight at the proposal stage: an integration, reporting tool or extra module that was never in the bid arrives after signature as a change request. More broadly, [BCG's 2020 research on digital transformation](https://www.bcg.com/publications/2020/increasing-odds-of-success-in-digital-transformation) found that 70% of transformation programmes fell short of their objectives. We look at where ERP projects typically go off the rails in [why ERP projects fail](https://digitalbridge.com.tr/en/blog/why-erp-projects-fail.html).

As of 2026, ERP in Türkiye is still a first-time decision for many firms. According to [TurkStat's ICT Usage in Enterprises Survey 2025](https://veriportali.tuik.gov.tr/tr/press/54012), only 28.3% of enterprises with 10 or more employees used ERP software. With no previous selection to compare against, a structured method matters all the more.

## What should an ERP proposal include? Eight core sections

Before scoring any ERP proposal, check that each one actually contains the sections below. A missing section is an ambiguity that tends to return later as a change request, so ask the vendor to complete it in writing.

1. **Scope and fit-gap response.** For every requirement you sent: "standard", "configurable", "needs development" or "not supported". We explain how to build that requirement list in [software requirements analysis](https://digitalbridge.com.tr/en/blog/software-requirements-analysis.html).
2. **Licensing or subscription model.** User types (full, limited, read-only), named or concurrent users, which modules are included and how pricing changes as headcount grows.
3. **Implementation services.** Phases, the deliverable and fee for each, who from the vendor will do the work and how much time your own staff are expected to commit.
4. **Data migration.** Which records (customers, suppliers, stock, bills of materials, open orders, opening balances) are moved, by whom, and with how many trial loads.
5. **Integrations.** Whether links to your accounting package, e-commerce site, dealer portal, shop-floor systems and banks are listed as separate items.
6. **Local regulatory compliance.** How e-invoice, e-archive invoice, e-waybill and e-ledger obligations are handled, and which service provider or add-on is needed.
7. **Customisation and upgrades.** Whether bespoke changes survive a version upgrade, and what that costs.
8. **Support, contract and exit.** Support channels and response times, what maintenance fees cover, who owns the data and any custom code, and in what format your data is returned when the contract ends.

Local regulatory compliance is specific to Türkiye and often underestimated. As of 2026, the Revenue Administration (GİB) makes e-invoicing and e-ledgers mandatory for broad groups of taxpayers that meet set criteria, and its [2025 Annual Report](https://cdn.gib.gov.tr/api/gibportal-file/file/getFileResources?objectKey=arsiv/fileadmin/faaliyetraporlari/2025/2025_faaliyet_raporu.pdf) records that 219 commercial e-ledger software packages had passed its compliance tests by the end of 2025. Ask each vendor to state in writing which component their solution relies on; our [e-ledger guide](https://digitalbridge.com.tr/en/blog/e-ledger-turkey-guide.html) explains how the ledger connects to ERP data.

## How do you score ERP proposals? The weighted evaluation matrix

Once the eight sections are complete, put the ERP proposals side by side. Give each criterion a weight before you open the bids (1 low, 3 high) and score every proposal from 1 to 5; weight multiplied by score gives the total. Weights set after reading the bids tend to justify the favourite.

| Criterion | Suggested weight | Question to ask when scoring |
|---|---|---|
| Requirement fit | 3 | How many critical requirements are standard or configurable, and how many need development? |
| Implementation approach and team | 3 | Are phase deliverables and acceptance criteria written down, and are the named people known? |
| Data migration | 2 | Which data, how many trial loads, and who owns the clean-up? |
| Integrations | 2 | Is each link a separate line item, with its method (API, file, database) specified? |
| Regulatory compliance | 2 | How does the e-invoice, e-archive, e-waybill and e-ledger flow work end to end? |
| Total cost of ownership | 3 | Are licences, implementation, maintenance, extra users and upgrades costed over several years? |
| Support and continuity | 2 | Are response times, on-site support terms and maintenance scope clear? |
| Data ownership and exit | 2 | Who owns the data and custom work, and what is handed over at exit? |

When you work out the ERP's total cost of ownership (TCO), look beyond year one and set several years of licences, maintenance and further development side by side. We list what drives an ERP budget in [ERP cost factors](https://digitalbridge.com.tr/en/blog/erp-cost-factors.html). If you are still weighing a packaged ERP against a bespoke one, our [custom vs off-the-shelf software guide](https://digitalbridge.com.tr/en/blog/custom-vs-off-the-shelf-software.html) compares the two on total cost.

## Scripted demos and reference calls: testing the proposal

The ERP scoring sheet measures what the proposal says; a demo shows whether it actually works. Instead of a general product tour, give each vendor three or four end-to-end scenarios using your own sample data, such as "customer order to shipment and e-invoice", "purchase request to goods receipt and supplier invoice" or "bill of materials to work order and product cost". Have the same people watch every demo and score it on the same form.

Choose demo scenarios that reflect your sector. In manufacturing, scrap, semi-finished goods and work-order costing tend to cause the most friction; in wholesale and distribution, multi-warehouse stock, dealer price lists and returns; in project-based services, project costing and progress billing.

On reference calls, do not settle for the vendor's chosen success story. Ask to speak to a customer of similar size and sector, and find out what was hardest at go-live, how many trial loads the data migration took and how quickly support tickets were answered. For criteria that assess the vendor as a whole, see our guide to [choosing a software company](https://digitalbridge.com.tr/en/blog/choosing-a-software-company.html).

Watch for these warning signs during ERP proposal evaluation:

- Scope written as one-line headings such as "inventory module" or "finance module", with no answer to individual requirements.
- Data migration and training dismissed as "customer responsibility", with no support effort costed.
- No answer to whether customisations survive a version upgrade.
- Nothing on how your data is handed back when the contract ends.

Survival of customisations and the return of your data belong in the contract; we cover ownership, licensing and escrow options in [software contracts and source code](https://digitalbridge.com.tr/en/blog/software-contract-source-code.html). Because staff and customer data will live in the ERP, also check the agreement the vendor signs as a data processor using our [data processing agreement guide](https://digitalbridge.com.tr/en/blog/data-processing-agreement-turkey.html).

## How Digital Bridge approaches ERP proposals

Digital Bridge works on both sides of this process. As a supplier, we do not install packaged ERP for [custom ERP and enterprise resource planning](https://digitalbridge.com.tr/en/software-solutions/erp-enterprise-resource-planning.html) projects; we start with a process analysis and then submit a written proposal setting out scope, phases and fees. With a bespoke ERP you pay no licence for modules you do not use, the source code is yours, and statutory accounting can stay in the package your finance team already knows.

On the buyer's side, our [independent IT consultancy](https://digitalbridge.com.tr/en/consultancy.html) turns your requirements into testable [technical specifications](https://digitalbridge.com.tr/en/blog/writing-technical-specifications.html), helps you compare incoming proposals on one sheet, and after selection follows the contractor through interim deliveries and acceptance testing. Our recommendations are shaped by your needs, not by any particular brand. If the order of investment is still unclear, the work starts with a roadmap through [digital transformation consultancy](https://digitalbridge.com.tr/en/consultancy/digital-transformation-consultancy.html).

We treat integration as its own workstream in both roles. Links to your accounting package, online shop, dealer system or banks are designed under [API integration](https://digitalbridge.com.tr/en/software-solutions/api-integration.html) and [integrated systems](https://digitalbridge.com.tr/en/software-solutions/integrated-systems.html); for manufacturers we map how shop-floor data reaches the ERP using the [MES vs ERP distinction](https://digitalbridge.com.tr/en/blog/mes-vs-erp.html). Cleaning customer and product records before migration is part of the plan from day one, following the steps in our [master data management guide](https://digitalbridge.com.tr/en/blog/master-data-management-guide.html).

## Next step in evaluating ERP proposals

If you already hold more than one ERP proposal, use the eight sections in this guide as a checklist and ask vendors to fill any gaps in writing. Then fix your weights and complete the scoring matrix. You will find the other stages of the buying journey among our [software development guides](https://digitalbridge.com.tr/en/blog/topic/yazilim.html).

If you would like an independent second pair of eyes on your proposals, or want to plan a process analysis for a bespoke ERP, get in touch through our [contact page](https://digitalbridge.com.tr/en/contact.html) and we will go through your requirements and the bids with you.

## Frequently Asked Questions

### What is the most important criterion in an ERP proposal?

The most important criterion is how many of your critical requirements are met by standard functionality or configuration, and how many need development. Price only becomes a meaningful comparison once scope is equal. Comparing the totals of two proposals that cover different scopes means comparing two different jobs. Complete the fit-gap comparison first, then look at total cost of ownership over several years.

### How many ERP proposals should we request?

In practice, three to five proposals give a sound basis for comparison. Fewer makes it hard to see the market, while many more consumes the time your evaluation team needs for scripted demos and reference calls. What matters more than the number is sending every vendor the same written requirements and asking for answers in the same format, so every proposal prices the same job.

### Why do ERP proposal prices vary so widely?

Most of the price gap comes from differences in scope. One proposal may include data migration, integrations and training, while another quietly leaves them to the customer. The licensing model widens the gap too: an annual subscription looks cheaper in year one, a perpetual licence costs more up front. Align the line items first, then compare licences, implementation, maintenance and extra users as total cost of ownership over several years.

### What is the difference between a scripted demo and a standard demo?

In a standard demo the vendor shows the product's strongest screens using data it has prepared. In a scripted demo you supply end-to-end business scenarios with your own sample data, such as order to shipment and invoice. That reveals where the software struggles with your process and which steps would need manual work or extra development. Every vendor should receive the same scenarios.

### Why should data migration be assessed separately in an ERP proposal?

Data migration is one of the most labour-intensive and most underestimated parts of an ERP project. Customer, stock, bill of materials and opening balance data must be cleaned, mapped and validated through several trial loads. If the proposal does not say who does this and how many trial loads are included, the burden will most likely fall on your own team or return later as a change request.

### Do we need an independent consultant to evaluate ERP proposals?

It is not mandatory, but it helps if nobody on your team has run an ERP selection before. An independent consultant writes requirements in a testable form, puts the bids on one sheet, prepares questions for vendors and, after selection, follows interim deliveries and acceptance testing. It matters that the consultant earns nothing from selling a particular product, so the advice stays impartial.

### How do you calculate total cost of ownership in an ERP proposal?

Total cost of ownership is not just the first-year price; it is the sum of licence or subscription, implementation services, annual maintenance, extra users, customisation and upgrade costs over several years. An annual subscription looks cheap in year one and a perpetual licence looks expensive up front, so compare proposals over the same number of years and ask vendors to put any missing items in writing.
