Phone: 0 (552) 380 25 25  |  Weekdays 10:00–18:00 · Technical support 24/7

🇹🇷 TR

Cloud Migration & Infrastructure Consultancy

Cloud Migration Starts With Deciding What Moves

Cloud migration consultancy helps you decide, with measured data, which systems move to the cloud and which stay on-premises. We build an infrastructure inventory and a cost model based on real usage, design the hybrid architecture and backup regime, and prepare a rollback plan for every migration step, tested before it is needed.

The cloud is not automatically cheaper or better for every workload. Migrate without a proper inventory and the monthly bill becomes hard to predict. Stay put, and a business-critical application may still be running on a single physical server with no fallback.

This service is for organisations with ageing servers, a growing number of sites, or a cloud bill nobody can fully explain. We look at each system in terms of business need, tolerance for downtime and cost, and recommend where it should run. The answer is usually hybrid: production and regulated data stay on-premises, the rest moves.

Cloud migration consultancy: hybrid infrastructure, backup and disaster recovery planning

What Our Cloud Migration Consultancy Covers

Infrastructure Inventory

Servers, virtual machines, storage and network are catalogued, with the real resource usage of each system and the applications that depend on it.

Migration Decisions & Sequencing

Each application gets a decision (move as is, keep in place or rebuild) and the migration order is set by risk and dependency.

Cost Model

Cloud costs are based on measured usage, not guesswork. Where you already use the cloud, we review idle resources, reserved capacity and scaling rules.

Backup & Disaster Recovery

Acceptable data loss and downtime are agreed with management for each system. Backup and restore procedures are put in place, and restores are actually tested.

Hybrid Architecture & Connectivity

Secure links between field devices, production systems and the cloud, with existing applications connected through system integration and data that must legally stay on-premises kept separate.

Access & Security

Identity management, least-privilege access and network segmentation, with configuration reviewed together with our cyber security team.

Typical Engagements

  • Replacing end-of-life physical servers
  • Centralising systems spread across branches
  • Hybrid architecture for production systems
  • Hosting and scaling your own software product
  • Setting up a disaster recovery environment
  • Reviewing a cloud bill that keeps growing
  • Data centre or server room relocation
  • Reviewing your current backup arrangements

How We Work

01
Inventory & Dependencies

Systems, applications and the links between them are mapped, and resource usage is measured.

02
Target Architecture & Cost

A target design is drawn up and the alternatives compared on cost, risk and downtime impact.

03
Pilot Migration

A low-risk system moves first, proving performance, real cost and the rollback procedure in practice.

04
Phased Migration & Handover

The remaining systems move in the agreed order; operating procedures and monitoring are handed to your team.

No Migration Without a Way Back

For every migration step, the route back to the previous environment is written down and rehearsed before cutover. A plan first tried on cutover night is not really a plan.

Questions we hear most often

Frequently Asked Questions

Should we move all our systems to the cloud?

Usually not. The cloud is not automatically cheaper or better for every workload. Each system is assessed on business need, tolerance for downtime and cost, and gets its own decision: move as is, keep in place or rebuild. The answer is usually hybrid, with production and regulated data on-premises and the rest in the cloud.

How does a cloud migration project run?

In four steps. First, systems, applications and their dependencies are catalogued and resource usage is measured. Next, the target architecture is designed and options are compared on cost, risk and downtime. Then a low-risk system is migrated as a pilot. Finally, the remaining systems move in the planned order and operating procedures are handed over to your team.

How can cloud costs be kept under control?

Costs are modelled on measured resource usage rather than guesswork. If you already use the cloud, idle resources, reserved capacity and scaling rules are reviewed. The pilot migration confirms real costs in practice, so the monthly bill becomes predictable before the full move, and the reasons behind an unexplained bill are identified one by one.

What happens if something goes wrong during migration?

For every migration step, the way back to the old environment is written down and actually tested before the move. A rollback plan used for the first time on migration night is not really a plan. During the pilot, the rollback procedure is verified in practice alongside performance and cost.

Do you prepare a disaster recovery plan?

Yes. Acceptable data loss and downtime are agreed with management for each system. Backup and restore procedures are built around those targets, and restores are actually tested. Where needed, a separate disaster recovery environment is designed, and your existing backup arrangements are reviewed as part of the work.

Have a different question? Ask Us

Talk to an Engineer

Tell us what you need to solve. We'll come back with a written proposal.